Infraestructura Vial

Infraestructura Vial

Grupo BCR is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release.

Blvd. Stiva | León, Gto.
Datos técnicos: Superficie de construcción 7600 m2
Cliente final: Parque Industrial STIVA
Tiempo de Ejecución: 120 días
Blvd. Stiva | León, Gto.
Datos técnicos: Superficie de construcción 7600 m2
Cliente final: Parque Industrial STIVA
Tiempo de Ejecución: 120 días
Blvd. Stiva | León, Gto.
Datos técnicos: Superficie de construcción 7600 m2
Cliente final: Parque Industrial STIVA
Tiempo de Ejecución: 120 días
Blvd. Stiva | León, Gto.
Datos técnicos: Superficie de construcción 7600 m2
Cliente final: Parque Industrial STIVA
Tiempo de Ejecución: 120 días
Previous slide
Next slide
Bvld. Oleoducto | León, Gto.
Datos técnicos: Superficie de construcción 2800 m2
Cliente final: Parque Industrial Stiva
Tiempo de ejecución: 90 días
Bvld. Oleoducto | León, Gto.
Datos técnicos: Superficie de construcción 2800 m2
Cliente final: Parque Industrial Stiva
Tiempo de ejecución: 90 días
Bvld. Oleoducto | León, Gto.
Datos técnicos: Superficie de construcción 2800 m2
Cliente final: Parque Industrial Stiva
Tiempo de ejecución: 90 días
Bvld. Oleoducto | León, Gto.
Datos técnicos: Superficie de construcción 2800 m2
Cliente final: Parque Industrial Stiva
Tiempo de ejecución: 90 días